This is a continuation from part 3.
Below: Potentiometers being attached to the control plate, with washer being placed.
Below: Washers for both pots placed.
Below: A 1/2″ nut driver being used to tighten the nuts to the washers.
Below: Tightening the other pot to the plate.
Below: Output jack being held underneath and attaching nut on top of the plate (a washer has already been installed).
Below: Tightening the nut for the output jack.
Below: Lower concentric control being installed.
Below: Other lower concentric control being installed.
Below: A small slotted head screwdriver being used to tighten and install the upper concentric control.
Below: Installing the other upper concentric control.
Below: The completed assembly.
Below: The completed assembly, rear.












